Feasibility of Your Team Project

As previously assigned, your Team Project assignment is: Assume your team is a group of consultants that have been asked by the company to develop Information Systems Requirements for a critical system.

The feasibility lecture materials identified four potential tests of feasibility as Operational, Technical, Schedule, Economic.

In this thread we want to explore the potential that your critical system is not feasible. Therefore, please comment on the possibility that your critical system may NOT be operationally, technically, schedule, or economically feasible.

In other words, we are asking: why might the development of your critical system not be possible?

You will be answering this individually (no need to collaborate as a team on this discussion), but be sure to comment on the posts of at least one other class member.

PLEASE BE ADVISED I HAVE INCLUDED A SAMPLE PAPER, THE COMPANY THAT THIS SHOULD BE BASED ON IS AND WHAT THIS PAPER SHOULD BE BASED ON IS IN THE TEAMPROJECT ppt

Get a 10 % discount on an order above $ 100
Use the following coupon code :
BEST16
error: Content is protected !!